ASP OTOMASYON · ENGINEERING LIBRARY

Industrial automation,
clearly explained.

Practical knowledge for the people who connect, control, and improve industrial plants. From the first signal to the next system upgrade.

A field instrument sends data to a PLC, through an OPC UA gateway, and into a plant dashboard. Blue arrows trace the connection. THE CONNECTED PLANT From field signal
to useful data.
Explore the connectivity guide
221 engineering articles9 specialist categoriesEnglish first Translate when you need it

KNOWLEDGE INTO PRACTICE

What are you working on?

All project guides

EXPLORE THE LIBRARY

Find your area of expertise.

Full topic index

KEEP YOUR KNOWLEDGE CURRENT

New & recently improved.

See everything that changed
01
Process Industries Solutions

Pharmaceutical Batch Process Control and 21 CFR Part 11

Pharmaceutical manufacturing requires precise, repeatable, and fully documented batch control processes. Regulatory compliance with 21 CFR Part 11 (FD…

02
Field Devices & Instrumentation

Proximity and Photoelectric Sensors: Selection Guide

Choose an inductive, capacitive, or photoelectric sensor by target material, sensing distance, environment, and output wiring, then confirm the choice…

03
Field Devices & Instrumentation

Fixed Gas and Flame Detection: Design, Placement, and Testing

Fixed gas and flame detectors reduce risk only when technology, placement, voting logic, and test routines are set by the hazard study and the applica…

04
Modern Connectivity

Choosing an Industrial Communication Protocol: A Decision Guide

Pick an industrial protocol by the job it must do (cyclic control, device access, plant data, or telemetry), then match timing, data model, and securi…

05
Modern Connectivity

EtherCAT Fundamentals: Frames, Topology, and Distributed Clocks

EtherCAT sends frames that each device reads and writes as they pass, so cycle time, topology, and clock synchronization become engineering decisions…

06
Modern Connectivity

DNP3 and IEC 60870-5-104 Telecontrol Protocols Explained

DNP3 and IEC 60870-5-104 carry event-driven telecontrol data between a control center and remote sites, so design work centers on events, time stamps,…

FROM REFERENCE TO REAL PROJECT

Bring your next automation challenge.

PLC and DCS engineering, OPC connectivity, and digital transformation. Start with your installed systems, your constraints, and what you need to achieve.

Talk to ASP OTOMASYON